You are hereSchools > Franklin Elementary
  |  Login
 Contruction Checklist

Item #1

Item #2

Item #3

 Franklin Elementary School

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Foam being applied to the exterior for EIFS- 01/06/2012

Metal Stud Framed Ceiling- 01/06/2012

Classroom Building- North Wall Exterior: 12/06/2011

Classroom Building- 2nd Floor Metal Stud Framing: 12/06/2011

Classroom Building- 1st Floor Drywall Corridor: 12/06/2011

Classroom Building TPO Roofing

 

 Classroom Building Roof

 

2nd Level Catwalk

Exterior Brick Being Applied to the Classroom Building

Franklin Elementary Summer 2011:

 

Franklin Elementary pour.

 

Structural steel erection.

 

Concrete truck pump extended.

 

Ground floor concrete pour.

 

2nd floor metal decking.

 

Interior view of erection steel.

 

Waterproofing on a retaining wall.

 

KIVA steps.

 

Vapor barrier for lobby.

 

Structural steel.

 

SOG pour.

 

Concrete pump truck.

 

Slab on grade pour.

 

Seismic steel bracing.

 

Finishing SOG concrete.

 

Electrical rough-ins for mechanical room.

 

Column erection.

 

A framed retaining wall.