Foam being applied to the exterior for EIFS- 01/06/2012

Metal Stud Framed Ceiling- 01/06/2012

Classroom Building- North Wall Exterior: 12/06/2011

Classroom Building- 2nd Floor Metal Stud Framing: 12/06/2011

Classroom Building- 1st Floor Drywall Corridor: 12/06/2011

Classroom Building TPO Roofing


Classroom Building Roof

2nd Level Catwalk

Exterior Brick Being Applied to the Classroom Building





Franklin Elementary Summer 2011:

Franklin Elementary pour.

Structural steel erection.

Concrete truck pump extended.

Ground floor concrete pour.

2nd floor metal decking.

Interior view of erection steel.

Waterproofing on a retaining wall.

KIVA steps.

Vapor barrier for lobby.

Structural steel.

SOG pour.

Concrete pump truck.

Slab on grade pour.

Seismic steel bracing.

Finishing SOG concrete.

Electrical rough-ins for mechanical room.

Column erection.

A framed retaining wall.